1980 - 1989
1989
A new welding technology is introduced: for operations in North America the welding machine K 355 APT is equipped with Super Stretch an additional pulling device.
The Super C.A.T. a continuous action levelling, lining and tamping machine for track and switches with integrated ballast profiling units is presented at the REMSA in Toronto, Canada.
The research and testing department develops the ALC automatic guiding computer to control the recording systems on tamping machines.
Gantry crane PK 1-20 ES - for laying individual sleepers.
1988
1st May 1988: world speed record by Intercity Experimental ICE at 406.9 km/h on the new line Wurzburg-Fulda. Track work carried out primarily using
Perfection and cost-efficiency when working on switches, crossings and plain track using the Unimat 08-275 3S with synchronous 3-rail lift.
1987
WM 22 relaying machine for track and switches.
EM-SAT track survey car.
1986
Rail/road-going flash-butt welding machine K 355 APT-LKW.
1985
1984
1983
UNIMAT: universal levelling, lining and tamping machine with individually tiltable double tines for tracks and switches.
STRAIT: rail joint bending device with microprocessor control.
1982
Combined rail planing and grinding machine SBM 111.
High-speed track relaying machine SUM 1000 I.
1981
February 26th 1981: record-breaking run of an SNCF TGV train at 380 km/h. The line was built by contractors using
TRV 2001 laying machine with assembly line method
Controlmaster 08-32
SSP 103 ballast distributing and grading machine
DGS 42 N dynamic track stabilizer
1980
Opening of the new factory of Plasser Australia Pty. Ltd. in St. Marys near Sydney by the Premier and Minister of Finance of New South Wales.